
“ Waste to Energy, Brighten the Future "
GREEN NOVA ENERGY
WHO WE ARE
Green Nova Energy has been a pioneering force in the renewable energy sector since 2011, dedicated to transforming waste into clean, sustainable power. With a global presence and a firm commitment to environmental responsibility, we specialize in state-of-the-art waste incineration power generation projects that exceed international standards.
Our advanced technologies — including high-efficiency German Martin grate furnaces and Siemens steam turbine generator sets — ensure optimal energy conversion, minimal emissions, and maximum resource recovery. In addition to power generation, we implement comprehensive systems for wastewater treatment, slag reuse, and environmental monitoring, making us a leader in sustainable waste-to-energy solutions.
We are proud to play a vital role in advancing the global transition to clean energy, setting new benchmarks in environmental performance and technological excellence.
We are a proud member of Waste to Resource Ontario (W2RO), a network of industry leaders committed to sustainability and innovation in waste and recycling.
Being a W2RO member reflects our commitment to responsible resource management, environmental leadership, and advancing best practices in Ontario’s waste sector.
OUR WTE PROJECTS
-
Changzhou WTE Project
The only Waste to Energy plant which is located in a downtown area in China, no complaints since COD in 2008.
Removed its plant boundary and is equipped with public amenities
- Daily Treatment Capacity: 1*800tpd
- Design CV: 8MJ
- Parameter: 4.0Mpa, 400℃
-
Xiongan New Area WTE Project
The world's second and China's only underground waste integrated treatment project.
- Daily Treatment Capacity:2250(3*750)tpd
- Design CV: 10MJ
- Parameter: 6.4 Mpa, 450℃
-
Nanjing WTE Project
- Daily Treatment Capacity: 4000 (4*500tpd+3*667)tpd
- Design CV: 7.5MJ
- Parameter:4.0 Mpa, 400℃
-
Suzhou WTE Project
- Daily Treatment Capacity: 8050(3*350tpd+5*500tpd+6*750)tpd
- Design CV: 9MJ
- Parameter: 13 Mpa, 435℃
-
Vietnam Can Tho WTE Project
- Daily Treatment Capacity: 1*400tpd
- Design CV: 6.7MJ
- Parameter: 4.0 Mpa, 400℃